Research Status: TiEE is an experimental architecture under active technical validation. Performance figures not accompanied by a published reproducible benchmark should be interpreted as theoretical, modeled, projected, or experimental hypotheses—not independently verified production results. View validation status →

Sovereign FinOps Calculator • TiEE is Patent Pending

Interactive FinOps ROI Calculator

Explore a modeled financial scenario. Input facility power draw and electricity rate to estimate the hypothetical effect of an assumed 36.8% compute-reclamation rate. This calculator is not a forecast or verified savings claim.

Download Complete TiEE eBook

Infrastructure Parameters

Enter total continuous power capacity (e.g., 1,000 MW for a 1 GW AI cluster).
Blended industrial PPA or grid power rate (e.g., $0.06 / kWh).
Industry benchmark for GPUs, power delivery, and liquid cooling loops ($25M / MW).

Projected Financial Return

Baseline Annual Power Bill
$525.60M
Total annual facility electricity expenditure running 24/7.
Modeled OPEX Effect (Assumed 36.8%)
$193.42M
Direct savings from eradicating compute waste and thermal overhead via edge filtration.
Avoided GPU Cluster CapEx
$9.20B
Equivalent compute capacity reclaimed, avoiding redundant infrastructure buildouts.
Deploy TiEE Enterprise